User:Shawndouglas/sandbox/sublevel13

From LIMSWiki
< User:Shawndouglas‎ | sandbox
Revision as of 17:18, 3 October 2019 by Shawndouglas (Talk | contribs) (10. Instrument and Equipment Management)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Sandbox begins below

10. Instrument and Equipment Management

Requirement
10.7 The system shall allow the configuration of calibration and maintenance frequency and time frames, with available intervals of days, weeks, months, and years.