Difference between revisions of "Bias error ration"
From LIMSWiki
Jump to navigationJump to search (Created article stub.) |
(No difference)
|
Revision as of 21:40, 2 May 2011
The difference between the result and expected result as a fraction of the square root of sum of squares of the result uncertainty and expected result uncertainty.[1]
References
- ↑ SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm









