Template:LIMSpec/Scheduled event management

From LIMSWiki
Jump to navigationJump to search
Regulation, Specification, or Guidance Requirement
21 CFR Part 129.80 (g)
ASTM E1578-18 E-5-1
USDA Sampling Procedures for PDP 5.6–7
12.1 The system shall allow users to create, maintain, and revise schedules for various laboratory tasks and processes.
21 CFR Part 212.61 (a)
21 CFR Part 211.166 (b)
ASTM E1578-18 E-5-2
12.2 The system scheduler shall be capable of working with a variety of laboratory tasks like calibrations, maintenance, and stability studies.
ASTM E1578-18 E-5-3 12.3 The system scheduler shall automatically create a sample number specifically for recording the results of calibration, validation, and maintenance.
ASTM E1578-18 E-5-4 12.4 The system shall be capable of handling industry-specific testing characteristics (e.g., sampling points, human body sampling location).
ASTM E1578-18 E-5-5 12.5 The system shall provide a means for setting a standard or reagent's retest date based on a retest interval.