File:Fig11 CaoProcess2018 6-5.png

From LIMSWiki
Jump to navigationJump to search

Original file(3,630 × 1,703 pixels, file size: 2.05 MB, MIME type: image/png)

Summary

Description

Figure 11. Include equipment into PI Asset Framework (AF) elements

Source

Cao, H.; Mushnoori, S.; Higgins, B.; Kollipara, C.; Fernier, A.; Hausner, D.; Jha, S.; Singh, R.; Ierapetritou, M.; Ramachandran, R. (2018). "A systematic framework for data management and integration in a continuous pharmaceutical manufacturing processing line". Process 6 (5): 53. doi:10.3390/pr6050053. 

Date

2018

Author

Cao, H.; Mushnoori, S.; Higgins, B.; Kollipara, C.; Fernier, A.; Hausner, D.; Jha, S.; Singh, R.; Ierapetritou, M.; Ramachandran, R.

Permission
(Reusing this file)

Creative Commons Attribution 4.0 International

Other versions


Licensing

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current01:34, 16 May 2018Thumbnail for version as of 01:34, 16 May 20183,630 × 1,703 (2.05 MB)Shawndouglas (talk | contribs)

Metadata